News

  • Corporate
  • 2021.10.20

Higashiura Factory 3rd factory expansion

On October 20, 2021, we demolished the OP hall (welfare facility) next to the 3rd factory and expanded the 3rd factory with a structure that can withstand a seismic intensity of 6 upper. We have set up an OP hall (welfare facility) on the 3rd floor of the expansion, and have prepared disaster prevention equipment so that it can be used as an evacuation site for employees in the event of a disaster.

 

Extended factory                                                      (tents, food, portable toilets, etc.)

  

Back to news list